Technical articles

EPC Systems

See how integrated engineering, supplies and construction reduce interfaces and increase predictability.

Illustration of Article EPC Systems
01

Content

## Uma responsabilidade integrada

In the EPC model, engineering, supplies and construction are coordinated within a unique delivery strategy. The goal is to reduce gaps between disciplines and make responsibilities clearer.

This integration requires scope, performance criteria, supply limits and very well defined interfaces from the beginning.

## Engenharia prepara a execução

Surveys, balances, models, lists of equipment and assembly plans should reflect the actual conditions of the plant. Early decisions reduce improvisations during a shutdown windows.

Procurement and manufacturing are planned together with logistics, structures, electrical systems, automation and safety.

## Comissionamento fecha o ciclo

Step tests confirm assembly, instrumentation, interlocking and integrated performance. The final documentation and training support the operation after delivery.

Take the theme to your plant

Talk to our engineering team.

We assess process conditions, constraints and objectives before recommending a technical approach.

Talk to an expert
Next step

Shall we look at your process together?

Tell us about your operating challenge. Our technical team will help organize the assessment and possible solutions.