An integrated responsibility
In the EPC model, engineering, supplies and construction are coordinated within a unique delivery strategy. The goal is to reduce gaps between disciplines and make responsibilities clearer.
This integration requires scope, performance criteria, supply limits and very well defined interfaces from the beginning.
Engineering prepares execution
Surveys, balances, models, lists of equipment and assembly plans should reflect the actual conditions of the plant. Early decisions reduce improvisations during a shutdown windows.
Procurement and manufacturing are planned together with logistics, structures, electrical systems, automation and safety.
Commissioning closes the cycle
Step tests confirm assembly, instrumentation, interlocking and integrated performance. The final documentation and training support the operation after delivery.