Technical articles

EPC Systems

See how integrated engineering, supplies and construction reduce interfaces and increase predictability.

Illustration of Article EPC Systems
01

An integrated responsibility

In the EPC model, engineering, supplies and construction are coordinated within a unique delivery strategy. The goal is to reduce gaps between disciplines and make responsibilities clearer.

This integration requires scope, performance criteria, supply limits and very well defined interfaces from the beginning.

02

Engineering prepares execution

Surveys, balances, models, lists of equipment and assembly plans should reflect the actual conditions of the plant. Early decisions reduce improvisations during a shutdown windows.

Procurement and manufacturing are planned together with logistics, structures, electrical systems, automation and safety.

03

Commissioning closes the cycle

Step tests confirm assembly, instrumentation, interlocking and integrated performance. The final documentation and training support the operation after delivery.

Take the theme to your plant

Talk to our engineering team.

We assess process conditions, constraints and objectives before recommending a technical approach.

Talk to an expert
Editorial Gallery

See some photos

Images that help contextualize engineering equipment, processes and activities related to this content.

Engineering team in the technical office
Laser cutting machine in operation
Professional performing industrial welding
Duct transition under fabrication
Aerial view of the Brunnschweiler factory
Next step

Shall we look at your process together?

Tell us about your operating challenge. Our technical team will help organize the assessment and possible solutions.