
Pulp and paper · Project
Paraibuna PM8
Closed hood, air systems and false ceilings integrated into the process.
SegmentPulp and paper
Work arrangementProject
Our workLatin America
01
Background
The challenge needed to be observed as a system.
The PM8 needed to combine thermal containment, air distribution and building conditions in a single coordinated scope.
02
Approach
Field data guided the choices.
Closed hood, air systems and false ceilings were treated together to control the relationship between machine and room.
03
Result
A delivery prepared for routine.
The project delivered an integrated solution to conduct the process air and organize conditions around the machine.
Supply ScopeTalk to Engineering
Integrated fronts
- Closed hood
- Supply and exhaust air systems
- False ceilings
- Integration of assembly and start-up
Cases do not present process, production or performance proprietary data.
Next step
Shall we look at your process together?
Tell us about your operating challenge. Our technical team will help organize the assessment and possible solutions.
