
Pulp and paper · Project
Oji PC4 (Valmet)
New off-machine coater with complete air system, gas heating and heat recovery.
SegmentPulp and paper
Work arrangementProject
Our workLatin America
01
Background
The challenge needed to be observed as a system.
The new off-machine coater required a complete air system capable of meeting thermal control, heating and energy use.
02
Approach
Field data guided the choices.
The solution has connected air treatment and distribution, gas heating and heat recovery since interface engineering.
03
Result
A delivery prepared for routine.
The project organized thermal generation, distribution and recovery in a set prepared for the different conditions of the line.
Supply ScopeTalk to Engineering
Integrated fronts
- Complete air system
- Gas heating
- Heat recovery
- Integration and commissioning
Cases do not present process, production or performance proprietary data.
Next step
Shall we look at your process together?
Tell us about your operating challenge. Our technical team will help organize the assessment and possible solutions.
